Yara Clean Ammonia and Enbridge will jointly develop a CCS-based ammonia production facility in Corpus Christi, Texas. Located at the Enbridge Ingleside Energy Centre, as much as 1.4 million tonnes of ammonia per year will be produced, with Yara expected to act as full offtaker.
Content Related to Enbridge
Article
Momentum builds for CCS ammonia on the US Gulf Coast
Julian Atchison
May 17, 2022
This week we explore three announcements on the US Gulf Coast:
- North American pipeline giant Enbridge will join forces with Humble Midstream to develop a low-carbon ammonia export project near Corpus Christi, Texas. The project will be built within the Enbridge Ingleside Energy Center, currently the largest crude oil storage and export terminal in the US.
- Talos Energy, Chevron and Carbonvert will jointly develop the Bayou Bend CCS project in eastern Texas, where 275 million tonnes of carbon emissions could potentially be sequestered beneath the sea bed.
- And more details have emerged about CF Industries’ joint CCS ammonia project with Mitsui. The greenfield facility is expected to cost around $2 billion, and will produce between 1 - 1.4 million tonnes of ammonia per year.